River Infiltration Reduction from Mission to Spokane River

Project Number: 2015153

Construction Estimate: $860,000.00

Project Location: South of Mission to East of Spokane River

Description: Cure In Place Pipe (CIPP) to line 24-inch pipe along the Spokane River. Project is funded with federal funds.

Status: Design

Contractor: To be determined

Project Manager - Design: Dan Buller, 509.625.6700, dbuller@spokanecity.org

Project Manager - Construction: Construction Management, 509.625.7722

Construction Start Date: Summer 2019

Substantially Completed Date: Summer 2019

Award Date: To be determined