Title 13 Public Utilities and Services
Chapter 13.08 Utility Cost Recovery Methods
Article II. Special Conne ction Charges (formerly 13.03.0702 to 13.03.0712)
Section 13.08.250 Special Con
ne ction Charge – Computation
Determination by Director of Engine ering Services.
The special conne ction charge imposed pursuant to this chapter is paid into the sewer or water fund, as applicable and is computed based on the areas to be served by the water or sewer, which determination is made by the Director of Engine ering Services. Notwithstanding the methods of computing the special conne ction charge provided below, the City may use any other method or combination of methods to compute special conne ction charges which may be deemed to most fairly reflect the sewer service to the properties subject to the special conne ction charge. The amount may be computed as follows:
Method I: Line al Front Footage – Square Footage.
Lateral Line s.
The line al feet of frontage of property to be served by the water or sewer, as determine d by the director of engine ering services, is multiplied by the average cost per front foot of lateral line constructed in the City for the year in which the water or sewer to which the property is to be conne cted was constructed and accepted.
Trunk/Distribution/Transmission Line s.
The number of square feet of property to be served, as determine d by the director of engine ering services, is multiplied by the cost per square foot of service area (in the year of actual construction) of the trunk/distribution/transmission line to which a conne ction is being made.
Method II: Actual Cost.
For those specifically identified projects (as determine d by the Director of Engine ering Services) where the computation of special conne ction charges for trunk/distribution/transmission line can be determine d based on actual cost and where the City can identify at the outset of the project the service area and those properties for which the water or sewer facilities have been constructed, the special conne ction charge may be computed as follows:
Trunk/Distribution/Transmission Line s.
The trunk service area is divided gene rally into those zone s which are immediately serviceable by the trunk (with the addition of lateral line s) and those zone s which are not serviceable by the existing trunk without an extension or sub line (plus the ne cessary laterals). Each separate lot, tract, parcel or other property within the trunk/distribution/transmission line r service area is divided into those zone s, as determine d by the director of engine ering services.
Based upon the specific project cost, the Director of Engine ering Services computes an estimated cost of completing the trunk/transmission/distribution system ne cessary to serve the entire service area.
A cost per acre is then computed for the entire service area and this cost is the basis for special conne ction charges within the zone receiving immediate trunk/distribution/transmission line service from the completed project.
The special conne ction charges outside the immediately serviceable zone are based upon the average cost per acre after the charges for the immediately serviceable zone are deducted from the specific project costs.
Lateral Service in Conjunction with Trunk/Distribution/Transmission Service.
Where lateral service is provided together with trunk line service (i.e., a side water or sewer conne cting directly into the trunk/distribution/transmission line ), a lateral service fee may be charged as a part of the special conne ction fee.
This lateral fee is determine d by multiplying the average cost, per square foot of area served, of lateral line s constructed and accepted in the City in the year in which the water or sewer being conne cted to was constructed and accepted, by the area being served by the ne w conne ction.
Annual Average.
The Director of Engine ering Services is authorized to annually compute and establish the average cost per area for lateral and trunk/distribution/transmission line s completed by the City during the previous calendar year, which average assessment is used in computing the special conne ction charge imposed under this section.
The Director of Engine ering Services is also authorized to compute and establish the special conne ction charges based on actual construction costs for lateral and trunk/distribution/transmission line s, constituting special projects for which properties subject to the special conne ction charge can be identified at the outset of the project.
Such actual costs and the manne r in which the special conne ction charges will be computed are determine d by the Director of Engine ering Services upon completion and acceptance of the project by the City.
Such special projects shall be designated by project name and shall conform to the notice requirements of SMC 13.08.220.
A copy of the rates for computation of special conne ction charges is delivered and filed with the city clerk. Annual rate computations based on average costs are filed with the city clerk each year.
Date Passed: Monday, March 31, 2025
Effective Date: Saturday, May 10, 2025
ORD C36654 Section 16