Title 17C Land Use Standards

Chapter 17C.122 Center and Corridor Zones

Section 17C.122.200 Development Standards Table

Development standards that apply within Center and Corridor Zones are provided in Table 17C.122.200-2 Center and Corridor Development Standards

Table 17C.122.200-2

Center and Corridor Development Standards

HEIGHT STANDARDS

 

CC1

CC2

CC4

Neighborhood Center

55 ft [1][2]

55ft [1][2]

55ft [1][2]

District Center or Corridor

75 ft [1][2]

75 ft [1][2]

55 ft [1][2]

Employment Center

150 ft [2]

150 ft [2]

75 ft [2]

FLOOR AREA RATIO (FAR) STANDARDS

 

CC1

CC2

CC4

Neighborhood Center

Minimum FAR

No Minimum

No Minimum

No Minimum

Maximum FAR

No Maximum

No Maximum

No Maximum

District Center

Minimum FAR

0.5

0.5

0.5

Maximum FAR

No Maximum

No Maximum

No Maximum

Employment Center

Minimum FAR

1

1

1

Maximum FAR

No Maximum

No Maximum

No Maximum

SETBACK STANDARDS

 

CC1

CC2

CC4

Minimum setback from street lot line

0 ft.

0 ft.

0 ft.

Minimum setback from R1 and R2 zoned lots

10 ft. [3]

10 ft. [3]

10 ft. [3]

Minimum setback from all zones except R1 and R2

0 ft. [3]

0 ft. [3]

0 ft. [3]

LOT DIMENSIONS

 

CC1

CC2

CC4

Minimum front lot line width

10 ft.

10 ft.

10 ft.

[1] An additional fifteen ft of height is permitted provided that at least one condition under Section 17C.122.090 Public Amenities Allowing Additional Height is met.

[2] Structures over seventy feet in height must follow the standards in Chapter 17C.250 Tall Building Standards.

[3] Structure setbacks are measured from the lot line.

 

Date Passed: Monday, August 12, 2024

Effective Date: Sunday, September 15, 2024

ORD C36556 Section 6

September 26, 2024