Title 17C Land Use Standards
Chapter 17C.182 Fairchild Overlay Zones
Section 17C.182.500 Bird – Aircraft Strike Hazard Requirement
- Stormwater management facilities associated with development located in military influence areas 2 and 3/4 shall be designed in compliance with the Washington State department of transportation Aviation Stormwater Design Manual - Best Management Practices and as may be amended.
- A project landscaping plan shall be provided to Fairchild AFB for comment, in accordance with the requirements of SMC 17C.182.600 where such landscaping plan is a required element of the development application as specified by SMC 17C.200.020. The planning services director or hearing examiner shall consider Fairchild AFB comment prior to taking action on the development application and may apply conditions of approval related to landscaping based on said comment. Required landscaping plans shall provide a detailed description of all species of trees and shrubs intended to be installed.
Date Passed: Monday, April 30, 2012
Effective Date: Saturday, June 16, 2012
ORD C34852 Section 1
Section 17C.182.500 Bird – Aircraft Strike Hazard Requirement
- Stormwater management facilities associated with development located in military influence areas 2 and 3/4 shall be designed in compliance with the Washington State department of transportation Aviation Stormwater Design Manual - Best Management Practices and as may be amended.
- A project landscaping plan shall be provided to Fairchild AFB for comment, in accordance with the requirements of SMC 17C.182.600 where such landscaping plan is a required element of the development application as specified by SMC 17C.200.020. The planning services director or hearing examiner shall consider Fairchild AFB comment prior to taking action on the development application and may apply conditions of approval related to landscaping based on said comment. Required landscaping plans shall provide a detailed description of all species of trees and shrubs intended to be installed.
Date Passed: Monday, April 30, 2012
Effective Date: Saturday, June 16, 2012
ORD C34852 Section 1