City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 17F
Chapter 17F.090
Sections 17F.090.050...
 

Title 17F Construction Standards

Chapter 17F.090 Mechanical Code

Section 17F.090.050 Conversion Burners

In addition to IMC Section 107, no person may put a gas-fired conversion burner into final operation until the burners and controls have been tested and adjusted within the limits prescribed by the building services department and the gas utility and until a copy of a satisfactory conversion burner test record is filed with the mechanical inspector prior to or at the time of final inspection.

Date Passed: Monday, November 26, 2007

Effective Date: Wednesday, January 2, 2008

ORD C34135 Section 15

Section 17F.090.050 Conversion Burners

In addition to IMC Section 107, no person may put a gas-fired conversion burner into final operation until the burners and controls have been tested and adjusted within the limits prescribed by the building services department and the gas utility and until a copy of a satisfactory conversion burner test record is filed with the mechanical inspector prior to or at the time of final inspection.

Date Passed: Monday, November 26, 2007

Effective Date: Wednesday, January 2, 2008

ORD C34135 Section 15