City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 17F
Chapter 17F.090
Section 17F.090.070
 

Title 17F Construction Standards

Chapter 17F.090 Mechanical Code

Section 17F.090.070 Unapproved Work
  1. Whenever the inspector finds materials used or work performed which does not conform to this code, the inspector rejects the work and orders the permittee, in person or by phone, and later in writing if requested, to make all corrections in materials and workmanship necessary to satisfy this code within fifteen days, or within such longer time as the inspector may grant for good cause, unless the permittee timely appeals to the hearing officer.
  1. Whenever the inspector finds any fuel gas piping, venting system, mechanical appliance or equipment:
    1. being used or maintained in a dangerous or unsafe condition; or
    1. being installed, altered or extended without a proper permit or by an unauthorized person;

the inspector notifies the building official. The building official gives written notice to the owners of the premises and the contractor to take corrective action in a specified time.

Date Passed: Monday, February 28, 2005

Effective Date: Saturday, April 2, 2005

ORD C33594 Section 8