Title 13 Public Utilities and Services
Chapter 13.03A Pretreatment
Article II. General Requirements
Section 13.03A.0208 Pretreatment Facilities [2.8]
Users are responsible for all cost and liability to provide wastewater pretreatment to comply with this chapter and shall achieve compliance with all applicable pretreatment standards and requirements contained or referenced in this chapter as specified by the EPA, state, City, or Plant Manager as may be most stringent. Any facilities required to pretreat wastewater to acceptable levels must be provided, operated, and well maintained at the user’s sole expense and liability. Engineering reports, detailed plans and specificati ons, and an operati on and maintenance manual acceptable to the Plant Manager showing pretreatment facilities and operati ng procedures, together with any other informati on required by the Plant Manager shall be submitted to the Plant Manager for review and approval before construction. Review and/or approval of plans, operati ng procedures or other submittals never relieves the user or submitting party from full compliance. Facilities must be maintained by the user in accordance with approved reports, plans, operati ng procedures, and other submittals.
Applicati on for plan approvals must be signed in accord with SMC 13.03A.0305(B) . Fees will be assessed in accordance with SMC 13.03A.1401 .
NOTE: Bracketed enumerati ons reference the numbering in the EPA Region 10 Model Ordinance of March 27, 2012.
Date Passed: Monday, November 9, 2020
Effective Date: Wednesday, December 16, 2020
ORD C35961 Section 17