Title 13 Public Utilities and Services
Chapter 13.03A Pretreatment
Article III. Wastewater Discharge Permit
Section 13.03A.0310 Permit Modific
ati on [3.10]
The Plant Manager may modify a discharge permit with or without a request to do so:
to incorporate any new or revised federal, state, or local pretreatment standards or requirements;
to address significant alterati ons or additions to the user’s operati on, processes, or wastewater volume or character since the time of the discharge permit issuance in the opinion of the Plant Manager;
where there is a change in the POTW that requires either a temporary or permanent reduction or eliminati on of the authorized discharge in the opinion of the Plant Manager;
where there is informati on indicati ng that the discharge poses a threat to the POTW, City personnel, any beneficial sludge use, or the receiving waters in the opinion of the Plant Manager;
because of violati on of any terms or conditions of the individual discharge permit;
because of misrepresentati ons or failure to fully disclose all relevant facts in the permit applicati on or in any required reporting;
because of a revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR §403.13;
to correct typographical or other errors in the individual discharge permit; or
to reflect a transfer of the facility ownership or operati on to a new owner or operator where requested; or
for any other reason deemed due and sufficient.
Modificati on Requests.
Permit modificati on requests must be verified, signed by an authorized representati ve as provided in SMC 13.03A.0305(B) and include a fee as specified in SMC 13.03A.1401 . Submitting a permit modificati on request does not stay the running of the time within which an administrati ve appeal from a permit decision must be filed with the City hearing examiner. A permit modificati on is not required if there is no substantial change in a discharge, no increased pollutants or other conditions upon which modificati ons may be based, all in the opinion of the Plant Manager. Permit modificati on requests must address changes in slug control plans and industrial stormwater.
Notice.
If the Plant Manager deems the modificati on significant, notice is issued in like manner as an original permit decision and may be appealed in the same manner as for a permit decision.
NOTE: Bracketed enumerati ons reference the numbering in the EPA Region 10 Model Ordinance of March 27, 2012.
Date Passed: Monday, November 9, 2020
Effective Date: Wednesday, December 16, 2020
ORD C35961 Section 33