***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.08
Section 13.08.220
 

Title 13 Public Utilities and Services

Chapter 13.08 Utility Cost Recovery Methods

Article II. Special Connection Charges (formerly 13.03.0702 to 13.03.0712)

Section 13.08.220 Notice
  1. The City records appropriate notice with the Spokane County Auditor concerning real property (which has been specifically identified by the Director of Engineering Services and approved by the City Council as property for which water or sewer facilities either have been constructed or which it contemplates will be constructed) for which a special connection charge will be levied upon connection of such property to the City water or sewer system, pursuant to the requirements of RCW 65.08.170 and RCW 65.08.180.
  1. Such notice shall be effective until there is recorded with the county auditor a certificate of payment and release executed by the City, which certificate must be recorded within thirty days of full payment of such special connection charge.

Date Passed: Monday, March 31, 2025

Effective Date: Saturday, May 10, 2025

ORD C36654 Section 13