Title 13 Public Utilities and Serv ices
Chapter 13.04 Water
Section 13.04.2015 Outside City Planned Unit Developments (PUD)
Basic Charge.
In general, a planned unit development (PUD) designation is one approved in accord with applicable PUD development standards and serv ed by a master water meter. However, if a dwelling unit would otherwise be included within a PUD designation but has its own individual city water meter, it will be billed as a single-family residence under SMC 13.04.2012 or other applicable rate section. Questions of applicability are determined by the director. [Cross Reference: SMC 17A.020.160(T)]
Consumption.
For billing water consumption, the outside city PUD basic charge will be charged the same as a single-family residence outside the City limits except the PUD’s total consumption will be divided by the total number of dwelling units to determine the per-dwelling consumption for purposes of applying the rate steps defined in SMC 13.04.2012(B).
Size of Serv ice / Meter Charge Per Month.
Size of Serv ice
Meter Charge Per Month
2025
2026
1 inch or smaller
$41.22
$43.24
1 ½ inch
$61.35
$64.36
2 inch
$83.09
$87.16
3 inch
$127.47
$133.72
4 inch
$172.06
$180.49
6 inch
$239.53
$251.27
8 inch
$481.16
$504.73
10 inch
$698.20
$732.41
Capital Charge.
In addition to the basic charge and consumption charge, there shall be charged a capital charge for all accounts as established and provided for in SMC 13.035.500.
Date Passed: Monday, October 14, 2024
Effective Date: Wednesday, January 1, 2025
ORD C36587 Section 8