City of Spokane

Spokane Municipal Code

Home
Title 13
Chapter 13.04
Section 13.04.2005
 

Title 13 Public Utilities and Services

Chapter 13.04 Water

Article II. Rates

Section 13.04.2005 City Planned Unit Developments (PUD)

 

  1. Basic Charge.

In general, a planned unit development (PUD) designation is one approved in accord with applicable PUD development standards and served by a master water meter. However, if a dwelling unit would otherwise be included within a PUD designation but has its own individual City water meter, it will be billed as a single-family residence under SMC 13.04.2002 or other applicable rate section. Questions of applicability are determined by the Water Director. [Cross Reference: SMC 17A.020.160(X)]

  1. Consumption.

For billing water consumption, the PUD will be charged the same as a single-family residence within the City limits except the PUD’s total consumption will be calculated by multiplying the number of residential units by the maximum amount on each tier to get a new maximum usage allotted for each tier (for example, tier 1 is 0-600cf, a PUD of 12 homes would get 7200cf at tier 1 for purposes of applying the rate steps defined in SMC 13.04.2002(B).

  1. Size of Service / Meter Charge Per Month.

Size of Service

Meter Charge Per Month

 

2026

1 inch or smaller

$22.44

1 ½ inch

$36.59

2 inch

$51.86

3 inch

$83.06

4 inch

$114.39

6 inch

$161.82

8 inch

$331.55

10 inch

$484.17

  1. Capital Charge.

In addition to the basic charge and consumption charge, there shall be charged a capital charge for all accounts as established and provided for in SMC 13.035.500.

 

Date Passed: Monday, December 8, 2025

Effective Date: Sunday, January 18, 2026

ORD C36777 Section 3

February 12, 2026