City of Spokane

Spokane Municipal Code

Home
Title 17C
Chapter 17C.122T
Section 17C.122T.004
 

Title 17C Land Use Standards

Chapter 17C.122T Center and Corridor Zone Development Tables

Section 17C.122T.004 Table 17C.122.110-1 Center and Corridor Zone Development Standards
TABLE 17C.122.110-1
CENTER AND CORRIDOR ZONE DEVELOPMENT STANDARDS [1]
STANDARD CC1 CC2 CC4
Minimum setback from street lot line 0 ft. [2] 0 ft. [2] 0 ft. [3]
Minimum setback from R1 and R2 zoned lots [4] 10 ft. 10 ft. 10 ft.
Minimum setback from lot line abutting O, OR, NR, NMU, CB, GC, DT, CC, LI or HI zoned lot [4] 0 ft. 0 ft. 0 ft.
Minimum front lot line 10 ft. 10 ft. 10 ft.
Landscaping required [5] Yes Yes Yes
Parking required [6] Yes Yes Yes
Notes:
[1] Plan district of overlay zone standards may supersede these standards.
[2] Buildings over 70 ft. tall must follow chapter 17C.250 SMC, Tall Building Standards.
[3] When abutting R1 and R2 zoned lots, the minimum structure setback from street lot line is the same as the abutting residential zoning district for the first 60 ft. from the boundary of the abutting residential zoning district. See SMC 17C.120.230 for additional standards and exceptions. This does not apply when a zone boundary is within the public right-of-way.
[4] Structure setbacks are measured from the lot line.
[5] For general information purposes only. See chapter 17C.200 SMC, Landscaping and Screening, for the specific standards.
[6] For general information purposes only. See chapter 17C.230 SMC, Parking and Loading, for the specific standards.

Date Passed: Monday, February 25, 2013

Effective Date: Thursday, April 4, 2013

ORD C34961 Section 3

May 6, 2024