***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 12
Chapter 12.02
Sections 12.02.0304...
 

Title 12 Public Ways and Property

Chapter 12.02 Obstruction, Encroachment of Public Ways

Article II. Underground Utility Vaults – Sidewalk Installments

Section 12.02.0304 Permission Required

A utility or other entity or person proposing to install an underground utility vault shall first obtain permission from the director of engineering services.

  1. The director may require the submission of such plans and information as are deemed necessary.
     
  2. The director may make such inspections as desired and impose the fees provided in SMC 8.02.065(F).
     
  3. The director may impose conditions to issuance of permission or grant exception to this article as deemed necessary for the public health and safety.

Date Passed: Monday, June 25, 2007

Effective Date: Saturday, August 4, 2007

Recodification ORD C34053 Section 1

Section 12.02.0304 Permission Required

A utility or other entity or person proposing to install an underground utility vault shall first obtain permission from the director of engineering services.

  1. The director may require the submission of such plans and information as are deemed necessary.
     
  2. The director may make such inspections as desired and impose the fees provided in SMC 8.02.065(F).
     
  3. The director may impose conditions to issuance of permission or grant exception to this article as deemed necessary for the public health and safety.

Date Passed: Monday, June 25, 2007

Effective Date: Saturday, August 4, 2007

Recodification ORD C34053 Section 1