Title 10 Regulation of Activities
Division II. License Code
Chapter 10.36 Gas Transmission and Distribution
Section 10.36.090 Breaking Pavement
Whenever installation of gas facilities requires excavation of existing pavement, the excavator must:
- score or otherwise cut asphalt pavement in a straight line and, using a concrete saw, cut a sufficient kerf to allow complete breakage of the pavement and base without ragged edges;
- make pavement cuts as vertical as possible;
- entirely remove the pavement to expose at least six-inch shoulders of undisturbed subgrade material, unless otherwise directed by the director of engineering services.
Date Passed: Monday, June 4, 2007
Effective Date: Wednesday, July 11, 2007
ORD C34041 Section 1 (Recodification)