Title 12 Public Ways and Property
Chapter 12.02 Obstruction, Encroachment of Public Ways
Article IV. Obstruction of Public Right-of-way
Section 12.02.0712 Temporary Repairs
- If, in the judgment of the director, it is not appropriate to patch or otherwise restore the public way, in part or in whole, in a permanent manner, because of soil conditions, weather, or other causes, the director may direct that the permittee lay a temporary patch of suitable material designated by the director until such time as a permanent repair is appropriate.
- Temporary repair measures ordered by the director must be promptly commenced, in no event longer than twenty-four hours after the notice of an order is given, or earlier, if the director deems it required by imminent circumstances. Such repairs must be promptly completed.
- In default of prompt accomplishment of temporary repairs in the manner directed, the City may proceed at once to accomplish the same at the permittee’s expense and liability.
Date Passed: Monday, June 25, 2007
Effective Date: Saturday, August 4, 2007
Recodification ORD C34053 Section 1