City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.03
Section 13.03.0734
 

Title 13 Public Utilities and Services

Chapter 13.03 Sewers

Article VIII. Wastewater General Facilities Charge

Section 13.03.0734 Appendix A – Wastewater General Facilities Charge Schedule

 

Appendix A – Wastewater General Facilities Charge Schedule

The 2026 ENR Adjusted rates will go into effect January 1, 2026.

Wastewater General Facilities Charge Updated for 2026

Meter Size

City-Wide Calculated Charge

2026

5/8"

$4,887

3/4"

$7,330

1"

$12,216

1.5"

$24,434

2"

$39,094

3"

$85,518

4"

$146,603

6"

$329,855

8" *Based on needed flowrates

To be Calculated

10" *Based on needed flowrates

To be Calculated

 

 

 

 

 

 

 

 

 

 

Date Passed: Monday, December 8, 2025

Effective Date: Sunday, January 18, 2026

ORD C36776 Section 55