City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.03
Section 13.03.1308
 

Title 13 Public Utilities and Services

Chapter 13.03 Sewers

Article XI. Rates

Section 13.03.1308 Large Industrial Users
  1. Industrial users which contribute more than:
    1. one hundred fifty thousand gallons (twenty thousand cubic feet) per day of wastewater flow,
    1. three hundred sixty pounds of BOD per day,
    1. two hundred ten pounds of SS per day, and/or
    1. sixteen pounds of P per day,

as an average for any seven days in each year, shall install approved wastewater flow metering, recording and totalizing equipment and refrigerated, proportional to flow, sampling equipment.

  1. If such industrial users do not supply approved monitoring facilities, they shall provide to the City every three months a report on wastewater loads for periods of normal operations based upon a minimum of seven days of flow proportioned sampling.
    1. The report shall be prepared by an approved independent licensed engineer or approved independent laboratory.

Date Passed: Monday, October 15, 2007

Effective Date: Wednesday, November 28, 2007

Recodification ORD C34122 Section 1