***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 17D
Chapter 17D.090
Section 17D.090.090
 

Title 17D City-wide Standards

Chapter 17D.090 Erosion and Sediment Control

Section 17D.090.090 Submittal

  1. All permit applications that require an erosion and sediment control plan shall be accompanied by the plans at the time of application or submittal. The number of erosion and sediment control plans required shall be determined by the applicable permit or contract process. All erosion and sediment control plans shall comply with the minimum requirements for erosion and sediment control plan standards in this chapter and in the Spokane Regional Stormwater Manual.
     
  2. Erosion and sediment control plans are only required to address the area of land that is subject to the ground disturbing activity for which a permit is being requested.
     
  3. The director shall review all erosion and sediment control plans. The director may waive items required by the SRSM where the director determines that certain items are not applicable to a specific application or project.
     
  4. The responsible party shall ensure that all requirements are addressed in the erosion and sediment control plan. The responsible party shall be accountable for any plan modifications needed due to conflicts, omissions, or changed conditions that arise in the field. The responsible party shall bear all costs to comply with the City of Spokane Design Standards, General Special Provisions, the SRSM, and the Spokane Municipal Code.

Date Passed: Monday, March 8, 2010

Effective Date: Sunday, April 11, 2010

ORD C34565 Section 1