TABLE 17G.061.010-1
SUMMARY OF APPLICATION TYPES AND REQUIREMENTS
|
|
Application Type
|
Notice of Community Meeting
|
Notice of Application
|
Notice of Hearing
|
Notice Content
|
Review Official
|
City Council Review
|
Expiration of Permit
|
BUILDING AND CODE ENFORCEMENT
|
Building Permit without SEPA
|
Excluded
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
Building Permit with SEPA (Commercial/Industrial/Other)
|
Type I
|
-
|
Sign
Posted
Legal
|
-
|
-
|
Building Official
|
-
|
180 days
|
Demolition Permit without SEPA
|
Type I
|
-
|
- [2]
|
- [1]
|
-
|
Building Official
|
-
|
180 days
|
Demolition Permit with SEPA [2]
|
Type I
|
-
|
Sign
Posted
Legal
Newspaper
|
- [1]
|
-
|
Building Official
|
-
|
180 days
|
Fence Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
Grading Permit without SEPA
|
Type I
|
-
|
Sign
Posted
Legal
|
-
|
-
|
Building Official
|
-
|
180 days
|
Grading Permit with SEPA
|
Type I
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
Manufactured Home Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
Sign Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
Residential Building Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
Remodel Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Building Official
|
-
|
180 days
|
ENGINEERING SERVICES
|
Address Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Approach Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Design Deviation – Street Design
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Encroachment Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
LID Formation
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Obstruction Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Road Closure
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Sidewalk Permit
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Stormwater Design Acceptance
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
Street Vacation
|
Excluded
|
-
|
-
|
-
|
-
|
Engineering Director
|
-
|
180 days
|
PLANNING AND ECONOMIC DEVELOPMENT SERVICES
|
Accessory Dwelling Unit (ADU)
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
180 days
|
Administrative Exemptions
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
180 days
|
Administrative Interpretations/Determinations
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
180 days
|
Binding Site Plan (BSP) – Preliminary
|
Type II
|
-
|
Individual
Sign
Posted
|
-
|
Project name
Proposed use
Acreage
# of lots
|
Planning Director
|
-
|
5 years
|
Binding Site Plan (BSP) – Final
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
N/A
|
Boundary Line Adjustment (BLA)
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
N/A
|
Certificate of Compliance (CC) – Hearing Examiner
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
|
Hearing Examiner
|
-
|
N/A
|
Certificate of Compliance (CC) – Planning Director
|
Type II
|
-
|
Individual
Sign
Posted
|
-
|
Project name
Proposed use
|
Planning Director
|
-
|
N/A
|
Conditional Use Permit (CUP) – Hearing Examiner
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
|
Hearing Examiner
|
-
|
3 years
|
Conditional Use Permit (CUP) – Planning Director [3]
|
Type II
|
-
|
Individual
Sign
Posted
|
-
|
Project name
Proposed use
|
Planning Director
|
-
|
3 years
|
Floodplain Development with SEPA
|
Type I
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
-
|
Proposed use
|
Planning Director
|
-
|
180 days
|
Floodplain Variance
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
|
Hearing Examiner
|
-
|
3 years
|
Home Occupation
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
N/A
|
Long Plat – Preliminary
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
Newspaper
|
Project name
Proposed use
Acreage
# of lots
|
Hearing Examiner
|
-
|
5 years
|
Long Plat – Final
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
N/A
|
Planned Unit Development (PUD) – Preliminary
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
Acreage
# of lots
|
Hearing Examiner
|
-
|
5 years [5]
|
Planned Unit Development (PUD) – Final
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
Yes
|
N/A
|
Shoreline Exemption/Determination/Interpretation
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
Must comply with WAC 173-27-90
|
Shoreline Substantial Development Permit (SDP)
|
Type II
|
-
|
Individual
Sign
Posted |
-
|
Project name
Proposed use
|
Planning Director
|
-
|
Must comply with WAC 173-27-90
|
Shoreline Variance
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
|
Hearing Examiner
|
-
|
Must comply with WAC 173-27-90
|
Shoreline Conditional Use Permit (CUP)
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
|
Hearing Examiner
|
-
|
Must comply with WAC 173-27-90
|
Short Plat – Preliminary with Standard Review and SEPA
|
Type II
|
-
|
Individual
Sign
Posted
|
-
|
Project name
Proposed use
Acreage
# of lots
|
Planning Director
|
-
|
5 years
|
Short Plat – Preliminary with Standard Review and No SEPA
|
Type II
|
-
|
Individual
Sign [4]
Posted [4]
|
-
|
Project name
Proposed use
Acreage
# of lots
|
Planning Director
|
-
|
5 years
|
Short Plat – Preliminary with Minor Review
|
Type II
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
5 years
|
Short Plat – Final
|
Excluded
|
-
|
-
|
-
|
-
|
Planning Director
|
-
|
N/A
|
Skywalk
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
-
|
Hearing Examiner
|
Yes
|
Up to 25 year agreement
|
Variance
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
Proposed standard
|
Hearing Examiner
|
-
|
3 years
|
Rezone
|
Type III
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Individual
Sign
Posted
|
Project name
Proposed use
Proposed zone
|
Hearing Examiner
|
Yes
|
3 years
|
Footnotes
[1] Public Hearing is required if the structure is on the National Historic Register.
[2] Applications for demolition permits for the demolition of an entire building or structure shall, in addition to any applicable requirements under chapter 43.21C RCW, be subject to a ten-day review and comment period. This review and comment period shall run concurrently with any other applicable notice and comment period. Following receipt of such applications, copies shall be forwarded to the individual(s) designated pursuant to SMC 4.27.010(D) to receive written notice on behalf of the neighborhood council in which the building or structure is located, at the address for such neighborhood council designee(s) that is on file with the department. Any comments submitted to the department by the neighborhood council during this review and comment period shall be provided to the applicant prior to issuing the demolition permit.
[3] Conditional Use Permits required under SMC 17C.111.110, Limited Use Standards for Religious Institutions and Schools, will complete posted/individual notification requirements for a Community Meeting.
[4] Sign and posted notice not required for 2-4 lots per SMC 17G.080.040(D)
[5] If a PUD is approved together with a preliminary plat, the expiration date for the PUD shall be the same as the expiration date of the preliminary plat.
|