City of Spokane

Spokane Municipal Code

Home
Title 13
Chapter 13.03
Section 13.03.0624
 

Title 13 Public Utilities and Services

Chapter 13.03 Sewers

Article VI. Sewer Construction

Section 13.03.0624 Inspection Procedures – Completed Work
  1. Notice must be given to the sewer maintenance supervisor at his office requesting inspection of all sewer work as provided herein and as provided in the “Regulations Governing Sewer Construction in the City of Spokane.”
    1. The sewer maintenance supervisor, or designee, thereafter inspects the same. The connection must be made in the manner prescribed in this code or by regulations, and to the satisfaction of the sewer maintenance supervisor, before the trench is filled.
    1. Costs of excavation in the event of noncompliance are borne entirely by the owner and/or the owner’s agent contractor.
  1. Sewers subject to inspection must be inspected and found satisfactory before covering pipe.
    1. The contractor must have a ladder on the job or a sloping ditch so that the inspector can readily enter the ditch.
    1. If the inspector deems a ditch unsafe, he need not enter it or complete the inspection.
    1. Reinspection occasioned by faulty or improper work or failure to comply with these provisions may be charged to the contractor or owner.

All requirements of the State of Washington department of labor and industries apply to persons working under this code.

Date Passed: Monday, October 15, 2007

Effective Date: Wednesday, November 28, 2007

Recodification ORD C34122 Section 1

May 3, 2024