City of Spokane

Spokane Municipal Code

Home
Title 13
Chapter 13.03
Section 13.03.1224
 

Title 13 Public Utilities and Services

Chapter 13.03 Sewers

Article XI. Rates

Section 13.03.1224 Stormwater Pumpage Connection User Charge

  1. Storm/groundwater basement connection for domestic users shall be a fixed rate based upon treatment and collection costs for standard strength wastewater assuming 0.36 Mgal/yr. (25 gpm @ 5 min./hr. x 24 hrs./day for four months) or based on actual sump pump run time and a fixed rate for future stormwater system expansion projects as reviewed and approved by the director.
     
  2. Storm/groundwater basement connections for commercial and industrial users shall be a site specific rate based on treatment and collection costs for standard strength wastewater for the capacity rating of the sump pump and the estimated pumping duration and a fixed rate for future stormwater system expansion projects as reviewed and approved by the director.

Date Passed: Monday, October 15, 2007

Effective Date: Wednesday, November 28, 2007

Recodification ORD C34122 Section 1

May 3, 2024