City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 08
Chapter 08.02
Section 08.02.064
 

Title 08 Taxation and Revenue

Chapter 08.02 Fees and Charges

Article VI. Land Use and Occupancy

Section 08.02.064 Plats

The fees for approvals under the subdivision code are:

  1. Long Plat Extension, Phasing, Vacation, Final or Alteration.
  1. For a one-year extension of time on a preliminary long plat approval: Five hundred fifty dollars.
  1. For phasing of an approved preliminary plat: Five hundred fifty dollars.
  1. For vacation of an approved plat: Four hundred ninety dollars.
  1. For a final long plat: Two thousand twenty-five dollars plus twenty-five dollars per lot.
  1. For alteration of an approved preliminary or final long plat: Eighty percent of the plat fee under this schedule.
  1. Short Plat Extension, Phasing, Vacation, Final or Alteration.
  1. For a one-year extension of time on a preliminary short plat approval: Five hundred fifty dollars.
  1. For phasing of an approved preliminary short plat: Five hundred fifty dollars.
  1. For vacation of an approved plat: Four hundred ninety dollars.
  1. For a final short plat except short plats with minor engineering review: A filing fee of one thousand eight hundred twenty dollars plus thirty dollars per lot.
  1. For a final short plat with minor engineering review: A filing fee of three hundred fifty dollars plus thirty dollars per lot.
  1. For alteration of an approved preliminary or final short plat: Eighty percent of the plat fee under this schedule.
  1. Binding Site Plan Extension, Final or Alteration.
  1. For a one-year extension of time on a preliminary binding site plan approval: Five hundred fifty dollars.
  1. For a final binding site plan: Two thousand nine hundred seventy dollars plus thirty dollars for each additional acre.
  1. For alteration of an approved preliminary or final binding site plan: Eighty percent of the binding site plan fee under this schedule, plus the cost of publishing the notice of hearing in the newspaper.
  1. Boundary Line Adjustment.

For a boundary line adjustment, a filing fee of three hundred fifty dollars.

  1. Street Name Change.

For changing the name of an existing dedicated street: One thousand three hundred fifty-five dollars.

  1. Other Matters.
  1. For any other matter not listed above that requires a public hearing before the hearing examiner: One thousand eight hundred ninety-five dollars.
  1. A fee of eighty-five dollars per hour may be charged to cover the cost of a particular planning staff service for the applicant that greatly exceeds the above fees or is not covered by the fees listed above.

Date Passed: Monday, June 27, 2022

Effective Date: Sunday, August 7, 2022

ORD C36226 Section 1