Title 13 Public Utilities and Services
Chapter 13.03 Sewers
Article XI. Rates
Section 13.03.1606 Monitoring Pretreatment Program
- The City of Spokane shall monitor the wastewater from industrial users discharging process wastewaters and commercial users expected or determined to discharge wastewaters with greater constituent strength than the range for standard strength wastewaters or constituents listed in Article IV of this chapter to determine the flow and wastewater strength and suitability for treatment at a frequency determined adequate by the director.
- The results of this monitoring shall be used to assess representative wastewater charges or to assure that no wastewater loading changes have occurred since the last billing rate adjustment.
-
- The scheduled frequency for monitoring each user or group of users shall be available for examination by the public.
- Industrial and/or commercial users who feel that more frequent monitoring would be desirable may monitor more frequently and submit reports for the director’s use in assessing charges. The monitoring and reports shall comply with this chapter and shall be at the user’s expense.
Date Passed: Monday, October 15, 2007
Effective Date: Wednesday, November 28, 2007
Recodification ORD C34122 Section 1