***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.03A
Section 13.03A.0208
 

Title 13 Public Utilities and Services

Chapter 13.03A Pretreatment

Article II. General Requirements

Section 13.03A.0208 Pretreatment Facilities [2.8]
  1. Users are responsible for all cost and liability to provide wastewater pretreatment to comply with this chapter and shall achieve compliance with all applicable pretreatment standards and requirements contained or referenced in this chapter as specified by the EPA, state, City, or Plant Manager as may be most stringent. Any facilities required to pretreat wastewater to acceptable levels must be provided, operated, and well maintained at the user’s sole expense and liability. Engineering reports, detailed plans and specifications, and an operation and maintenance manual acceptable to the  Plant Manager showing pretreatment facilities and operating procedures, together with any other information required by the Plant Manager shall be submitted to the Plant Manager for review and approval before construction. Review and/or approval of plans, operating procedures or other submittals never relieves the user or submitting party from full compliance. Facilities must be maintained by the user in accordance with approved reports, plans, operating procedures, and other submittals.
  1. Application for plan approvals must be signed in accord with SMC 13.03A.0305(B). Fees will be assessed in accordance with SMC 13.03A.1401.

NOTE: Bracketed enumerations reference the numbering in the EPA Region 10 Model Ordinance of March 27, 2012.

Date Passed: Monday, November 9, 2020

Effective Date: Wednesday, December 16, 2020

ORD C35961 Section 17