City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.03A
Section 13.03A.0402
 

Title 13 Public Utilities and Services

Chapter 13.03A Pretreatment

Article IV. Reporting Requirements

Section 13.03A.0402 Compliance Report Deadlines – Initial Reports [4.2]
  1. Deadlines.
    1. Within the earliest applicable date of ninety days following:
      1. The date for final compliance of an existing significant industrial user with applicable pretreatment standards and requirements,
      1. The date for final compliance in federal categorical standards, or
      1. The date for final compliance set in a discharge permit; or
    1. In the case of a new source or a new user determined by the Plant Manager to fit the definition of a significant industrial user, within ninety days following the commencement of discharge.
    1. The affected user must submit to the Plant Manager a report as outlined in SMC 13.03A.0304(D) through (F) inclusive, and certified as provided in SMC 13.03A.0305(A), Fees will be assessed in accordance with SMC 13.03A.1401.
  1. For users subject to equivalent mass or concentration limits established by the City in accord with 40 CFR 403.6(c), the report in subsection (A) of this section shall contain a reasonable measure of the user’s long term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user’s actual production during the appropriate sampling period, and signed as provided in SMC 13.03A.0305(A). Fees will be assessed in accordance with SMC 13.03A.1401.

NOTE: Bracketed enumerations reference the numbering in the EPA Region 10 Model Ordinance of March 27, 2012.

Date Passed: Monday, November 9, 2020

Effective Date: Wednesday, December 16, 2020

ORD C35961 Section 39