Title 13 Public Utilities and Services
Chapter 13.03A Pretreatment
Article IV. Reporting Requirements
Section 13.03A.0405 Notification of Significant Production Changes [4.5]
- Any user operating under a discharge permit incorporating equivalent mass or concentration limits shall notify the Plant Manager in writing within two business days after the user knows or has a reasonable basis to know that production levels will significantly change in the ensuing calendar month and request approval. A user failing to give such notice and obtain approval in writing is required to comply with existing limits in the permit. A significant production level change is one as has been specified by the Plant Manager as significant, or in absence of this, a change of twenty percent or greater. All submittals under this section must be signed as provided in SMC 13.03A.0305(A) and accompanied by a review fee as provided in SMC 13.03A.1401.
- Additionally, the user must submit a permit modification application as provided in SMC 13.03A.0310, which must include an engineering report detailing the features of the change, including pertinent data and analysis.
NOTE: Bracketed enumerations reference the numbering in the EPA Region 10 Model Ordinance of March 27, 2012.
Date Passed: Monday, November 9, 2020
Effective Date: Wednesday, December 16, 2020
ORD C35961 Section 42