City of Spokane

Spokane Municipal Code

***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.04
Section 13.04.2008
 

Title 13 Public Utilities and Services

Chapter 13.04 Water

Section 13.04.2008 Construction Rates
  1. Rates for water used during construction will be charged per month, or fractional part thereof, in accord with the following rates.
    1. Worksite will be inspected at least every ninety days to determine meter status.
    1. The meter installation will be made at the earliest possible date.
    1. Residential meters installed prior to occupancy construction rates will apply until certificate of occupancy is granted.
  1. Size of Service / Meter Charge Per Month.

Size of Service

Meter Charge Per Month

 

2025

2026

1 inch or smaller

$21.28

$22.33

1 ½ inch

$34.71

$36.41

2 inch

$49.19

$51.60

3 inch

$78.78

$82.64

4 inch

$108.51

$113.83

6 inch

$153.49

$161.01

8 inch

$314.48

$329.89

10 inch

$459.25

$481.76

 

Date Passed: Monday, October 14, 2024

Effective Date: Wednesday, January 1, 2025

ORD C36587 Section 4