Title 13 Public Utilities and Services
Chapter 13.04 Water
Article II. Rates
Section 13.04.2015 Outside City Planned Unit Developments (PUD)
- Basic Charge.
In general, a planned unit development (PUD) designation is one approved in accord with applicable PUD development standards and served by a master water meter. However, if a dwelling unit would otherwise be included within a PUD designation but has its own individual city water meter, it will be billed as a single-family residence under SMC 13.04.2012 or other applicable rate section. Questions of applicability are determined by the director. [Cross Reference: SMC 17A.020.160(T)]
- Consumption.
For billing water consumption, the outside city PUD basic charge will be charged the same as a single-family residence outside the City limits except the PUD’s total consumption will be divided by the total number of dwelling units to determine the per-dwelling consumption for purposes of applying the rate steps defined in SMC 13.04.2012(B).
- Size of Service / Meter Charge Per Month.
|
Size of Service
|
Meter Charge Per Month
|
| |
2026
|
|
1 inch or smaller
|
$43.45
|
|
1 ½ inch
|
$64.68
|
|
2 inch
|
$87.59
|
|
3 inch
|
$134.38
|
|
4 inch
|
$181.39
|
|
6 inch
|
$252.52
|
|
8 inch
|
$507.26
|
|
10 inch
|
$736.07
|
- Capital Charge.
In addition to the basic charge and consumption charge, there shall be charged a capital charge for all accounts as established and provided for in SMC 13.035.500.
Date Passed: Monday, November 24, 2025
Effective Date: Wednesday, January 7, 2026
ORD C36811 Section 8