Title 13 Public Utilities and Services
Chapter 13.04 Water
Article II. Rates
Section 13.04.2015 Outside City Planned Unit Developments (PUD)
- Basic Charge.
In general, a planned unit development (PUD) designation is one approved in accord with applicable PUD development standards and served by a master water meter. However, if a dwelling unit would otherwise be included within a PUD designation but has its own individual city water meter, it will be billed as a single-family residence under SMC 13.04.2012 or other applicable rate section. Questions of applicability are determined by the director. [Cross Reference: SMC 17A.020.160(T)]
- Consumption.
For billing water consumption, the outside city PUD basic charge will be charged the same as a single-family residence outside the City limits except the PUD’s total consumption will be divided by the total number of dwelling units to determine the per-dwelling consumption for purposes of applying the rate steps defined in SMC 13.04.2012(B).
- Size of Service / Meter Charge Per Month.
Size of Service
|
Meter Charge Per Month
|
|
2024
|
1 inch or smaller
|
$38.52
|
1 ½ inch
|
$57.34
|
2 inch
|
$77.65
|
3 inch
|
$119.13
|
4 inch
|
$160.80
|
6 inch
|
$223.86
|
8 inch
|
$449.68
|
10 inch
|
$652.52
|
- Capital Charge.
In addition to the basic charge and consumption charge, there shall be charged a capital charge for all accounts as established and provided for in SMC 13.035.500.
Date Passed: Monday, August 28, 2023
Effective Date: Monday, January 1, 2024
ORD C36424 Section 8