***Note: Many local criminal codes can now be located under Chapter 10.60 SMC while others are now cited under the Revised Code of Washington (RCW), which was incorporated into the municipal code in 2022. (See SMC 10.58.010). Code Enforcement, including Noise Control and Animal Regulations are located in Chapters 10.62 through 10.74.

Home
Title 13
Chapter 13.03A
Section 13.03A.0302
 

Title 13 Public Utilities and Services

Chapter 13.03A Pretreatment

Article III. Wastewater Discharge Permit

Section 13.03A.0302 Permits as to New Sources, New Users [3.2]

At least ninety days prior to the anticipated start-up, any new source and any new user determined by the Plant Manager to be an SIU shall apply for a discharge permit and submit to the Plant Manager at a minimum, the information in SMC 13.03A.0304(A) through (E) as well as any applicable engineering reports (reference SMC 13.03A.0203(B) and SMC 13.03A.0208(A)). A new source or a new user cannot discharge without first obtaining a discharge permit. New sources and new users must include in their application the method of pretreatment they will use to meet applicable pretreatment standards and requirements as well as estimates of information in SMC 13.03A.0304(D) and (E).

NOTE: Bracketed enumerations reference the numbering in the EPA Region 10 Model Ordinance of March 27, 2012.

Date Passed: Monday, November 9, 2020

Effective Date: Wednesday, December 16, 2020

ORD C35961 Section 25