Project Number: 2010123
High Drive from 29th Avenue to Hatch Road
Construct a curbed roadway section with one lane in each direction and one bike lane in each direction. There will be sidewalks on at least one side. The project also includes storm drainage improvements, sanitary sewer improvements, a water main replacement, and three small combined sewer overflow storage tanks.
Phase 1 Construction Start Date: 2014
Phase 1 Completion Date: 2014
Phase 2 Construction Start Date: 2015
Phase 2 Completion Date: 2015
Award Date: To be determined