2018 (Cycle 8) Traffic Calming - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming. This project is funded with local funds.
Post Street Bridge Replacement - Post Street Pedestrian and Utility Bridge Replacement. Project funded with federal funds.
South Gorge Trail Phase 2 - Construct a 10-foot wide pedestrian & bike trail, water main & pavement reconstruction of Clarke Ave, and stormwater mitigation at various locations.
Sprague Avenue Rebuild Phase 2B - Sprague Ave from Division to Grant. Reconstruct the roadway while enhancing pedestrian and cyclist safety and provide utility replacements/upgrades.
2013 Downtown Pedestrian Improvements - This project will design and construct pedestrian improvement in the Downtown Core consisting primarily of structural sidewalk repair/replacement.
CSO Basin 23 Control Facility - Construction of 38,000 gallon storage tank in Ash Street and 13,000 gallon storage tank in Cedar Street near the intersection with Summit Parkway
CSO Basin 25 Improvements, Phase 1 and 2 - Water, sanitary and storm sewer installation/replacement and creation of stormwater swales on Main Ave, Water Ave, and Cedar St.
MLK Jr. Way/Riverside Drive Phase 2B - New street and associated utilities, swales, sidewalk and including a roundabout at Perry Street and Trent Avenue
Red Bank Park River Access - Install boat ramp to Spokane River and parking lot improvements. This project is funded with local and state funds.
Sprague/Sherman Bridge Plaza - Improve the Sprague Avenue and Sherman Street intersection providing a transit hub to facilitate the University District Bridge.