Interceptor I-03 Control Facility

Application/Permit Number: Z16-279CUP3

Location

2400 W. Buckeye and surrounding parcels

Applicant

City of Spokane Department of Engineering Services

Description

The City's Department of Engineering Services is proposing to construct a buried 1.8 million gallon CSO prevention tank, along with associated piping and access road. The preliminary dimensions of this tank are roughly 180' long X 100' wide. The precise routing of the piping from the proposed tank back to the interceptor has not been finalized. Three alternatives are under consideration and are attached as Alternatives A-C. The City's Wastewater Management Department is also proposing to construct a stormwater treatment swale in the same location adjacent to the CSO facility.

Decision

A public hearing was held on this proposal on June 30, 2016 at 9AM in the Council Briefing Center at 808 W Spokane Falls Blvd, Lower Level Spokane, WA 99201. The decision was issued on July 6th, 2016 by the Hearing Examiner. The date of the last day to appeal is July 27, 2016.

Related Documents


Contact Information

Written comments should be sent via mail or email:

Planning and Development Services
Ali Brast
Assistant Planner
808 W. Spokane Falls Blvd.
Spokane, WA 99201-3329
abrast@spokanecity.org