Application/Permit Number: Z16-464CUP3
35201.0001; partially on this parcel and partially on DOT property, south of 3rd Ave at the I-90/Hamilton St interchange.
City of Spokane Waste Water Management is proposing to construct a buried 2 million gallon CSO prevention tank and associated piping. DOT has requested a couple gravel access roads be constructed on top of the placed tank. The configuration of these roads can be found on the attached aerial site plan. In the Residential Single-Family zone, this proposal requires a conditional use permit.
City of Spokane Engineering Department
A public hearing was held on this proposal on August 4th, 2016 at 9AM in the Council Briefing Center at 808 W Spokane Falls Blvd, Lower Level Spokane, WA 99201. The decision was issued on August 8th, 2016 by the Hearing Examiner. The date of the last day to appeal is August 29th, 2016.
Ali Brast
Assistant Planner
808 W. Spokane Falls Blvd.
Spokane, WA 99201-3329