Sprague & Alki-Broadway – Freya to Havana Grind and Overlay

Project Number: 2024063

Status: Design

Overview

This project rehabilitates portions of Sprague Avenue and Alki-Broadway Avenue with a 2-inch grind and overlay. It also includes ADA ramp upgrades and selected stormwater improvements, extending pavement life and enhancing road safety.

Location

Sprague Avenue and Alki-Broadway Avenue between Freya and Havana

Project Timeline

  • Construction Start: Summer 2025
  • Estimated Completion: November 2025

Key Objectives

  • Pavement Rehabilitation: Grind and overlay to improve road conditions and durability.
  • ADA Compliance: Replace and upgrade curb ramps as needed.
  • Stormwater Infrastructure: Update catch basins and storm laterals to current standards.

Project Scope

The main activities within this project include:

  • Grind & Overlay: 2-inch surface renewal from Freya to Havana, excluding major intersections.
  • Full-Depth Pavement Repair: At severely damaged sections, including the eastbound curb lane on Sprague and sections along Alki-Broadway.
  • ADA Ramp Upgrades: Install compliant ramps where needed.
  • Stormwater Modifications: Replace catch basins and laterals as recommended by the Wastewater Department.
  • Traffic Signal Modifications: Limited upgrades at Sprague/Havana; add piano-key crosswalk striping.

Funding

  • Total Project Cost: $3,768,000
  • Sources: Federal NHS Asset Management, Local Arterial Street Fund match

Community Impact

Roadway improvements will enhance safety and ride quality with minimal disruptions. Detours and temporary lane closures will be in place as needed.

Environmental & Regulatory Compliance

The project follows NEPA requirements; additional stormwater or related permits may be required based on ground disturbance.


Contact Information

For questions or concerns regarding the construction work or the construction schedule, please contact the contractor’s public representative.

Contractor Public Representative
TBD

City Project Manager - Design Phase
Kristy Warren

City Project Manager - Construction Phase
Ryan Coles