Division Street Pedestrian Hybrid Beacons (at Everett, Longfellow and Weile)

Project Number: 2021071

Status: Design

Construction Estimate: $1,000,000

Project Description: Install pedestrian hybrid beacons (crossing signals) at three uncontrolled crosswalks on Division.

Install Pedestrian Hybrid Beacons with overhead lighting and communication equipment. Make the locations functional and accessible for cyclists using Rhoades-Weile, Everett and Longfellow as a through bike route. Meet timeframe to get 100% construction funding. The scope of the project includes the activities listed below.

  • Acquire right-of-way as needed to provide a good bike connection (wider than 6' sidewalk).
  • Rebuild/relocate refuge islands as best fits the design.
  • Coordinate with WSDOT Eastern Region traffic for intersection plans for approval and signal permits.
  • Install Pedestrian Hybrid Beacons with overhead lighting and communication equipment. Trenching was included in the estimate.

Project Location(s) and Schedule

  • Division/Longfellow, Division/Everett and Division/Rhodes-Weile

Crews will be in the area during the scheduled time frame. All schedules are approximate and dependent on weather and unforeseen delays. Once the contract has been awarded, contractors will be responsible for setting and maintaining the schedule for the work to be done. If you have questions regarding the construction schedule or the work being done, please contact the contractor’s public representative. Contractors are required to provide two business day’s notice to a homeowner/business if the homeowner/business owner’s property will be directly impacted by the work. This includes access issues. The contractor will do its best to minimize impacts on the public, but unforeseen circumstances may result in the need to temporarily revise traffic restrictions. For everyone’s safety, please obey all traffic signs.

Construction Zone Details

  • Planned Detours: To be determined
  • Planned Lane Restrictions: To be determined
  • Planned Road Closures: To be determined
  • Planned Utility Work: To be determined
  • Pavement Cut Moratorium in Effect: To be determined

Note: The contractor will do its best to minimize impacts on the public, but unforeseen circumstances may result in the need to temporarily revise traffic restrictions. For everyone’s safety, please obey all traffic signs.

Construction Start Date: September 2023

Construction Completed Date: November 2023

Contract Award Date: May 1, 2023

Contractor: To be determined

City Project Manager - Design Phase: Rich Proszek, rproszek@spokanecity.org, 509.625.6700

City Project Manager - Construction Phase: Construction Management


Contact Information

For questions or concerns regarding the construction work or the construction schedule, please contact the contractor’s public representative:
To be determined

If the contractor’s public representative cannot resolve your issue, please contact the City of Spokane - Engineering Services at 509.625.6700 or eraea@spokanecity.org.