This includes four projects in close proximity that will be constructed, not concurrently, in 2027. They are Sacajawea Safe Routes to School (project #2025059), 29th Avenue Grind and Overlay (project #2025074), 29th Avenue from Southeast Boulevard to Thor Street Restripe (project #2025060), and Grand Boulevard from 29th to 13th Avenues (project #2026054).
Project Number: 2025059
Status: Design
Construction Start Date: Estimated March 2027
Construction Completion Date: Estimated June 2027
Construction Estimate:$1.5 million
The project will enhance pedestrian access and safety with crossing treatments on Grand Boulevard from 28th to 37th Avenues and 29th Avenue at Arthur Street.
City Construction Relations Manager
Annie Deasy, 509.625.6102
City Project Manager - Design Phase
Kristy Warren, 509.625.6548
City Project Manager - Construction Phase
Mark Allen, 509.625.7757
Project Number: 2025074
Status: Design
Construction Start Date: Estimated September 2027
Construction Completion Date: Estimated November 2027
Construction Estimate:$1.75 million
The project will be a grind and overlay on 29th Avenue from High Drive to Grand Boulevard, stripe bike lanes and a center two-way left turn lane.
City Construction Relations Manager
Annie Deasy, 509.625.6102
City Project Manager - Design Phase
Ben Ward, 509.625.6303
City Project Manager - Construction Phase
Mark Allen, 509.625.7757
Project Number: 2025060
Status: Design
Construction Start Date: Estimated spring 2027
Construction Completion Date: Estimated fall 2027
Construction Estimate: $2.3 million
The project will restripe 29th Avenue from Southeast Boulevard to Ray Street and 27th Avenue from Southeast Boulevard to Fiske Street, modify traffic signal phasing, and install a pedestrian hybrid beacon at Mt. Vernon and Fiske and ADA curb ramps.
City Construction Relations Manager
Annie Deasy, 509.625.6102
City Project Manager - Design Phase
Zach Ward, 509.625.6862
City Project Manager - Construction Phase
Mark Allen, 509.625.7757
Project Number: 2026054
Status: Design
Construction Start Date: Estimated September 2027
Construction Completion Date: Estimated November 2027
Construction Estimate: $2.8 million
The project includes a grind and overlay, restriping Grand Boulevard from 29th to 13th avenues and reducing the travel lanes from 4 lanes to 3 lanes with a two-way left turn lane, adding enhanced pedestrian/bike crossings, leading pedestrian/bicycle interval at Grand Boulevard and 29th Avenue, and curb bumpouts. Additionally, STA stop enhancements and pedestrian refuge islands and the traffic signal at Grand Boulevard and 14th Avenue.
City Construction Relations Manager
Annie Deasy, 509.625.6102
City Project Manager - Design Phase
Zach Ward, 509.625.6862
City Project Manager - Construction Phase
Mark Allen, 509.625.7757