Riverside Avenue from Monroe to Wall Streets

Project Number: 2017087

Status: Design

Project Timeline

Construction Start Date: Estimated spring 2027

Construction Completion Date: Estimated fall 2027

Project Description

The project includes a 2-inch grind and overlay, removing the trolley tracks on Riverside Avenue from Monroe to Wall streets, reinstall protected bike lanes, replace traffic signal and 10-inch cast iron water main with 12-inch ductile pipe. The project will also add an enhanced STA bus stop on the east side of Riverside Avenue and Post Street.

Key Objectives

  • Improve Roadway: Grind and overlay pavement to create smoother driving surface.
  • Improve Bike and Ped Safety: Protected bike lanes will include striping modifications and Zicla curbing to prevent parked vehicle intrusion into bike lanes and replace lighting throughout project creating a safer walking environment.
  • Improve Signalization & Lighting: Replace traffic signal at Riverside and Post and modify signal at Lincoln to include a separate left turn phase and bike lane crossing.
  • Replace Water Main: Remove and replace existing 10-inch cast iron water main with 12-inch ductile iron.

Construction Estimate: $3 million

Project Map


Contact Information

City Construction Relations Manager
Annie Deasy, 509.625.6102

City Project Manager – Design Phase
Pete Cowger