School Walk Routes

Project Number: 2024080

Status: Construction

Project Timeline

Construction Start Date: July 2026

Construction Completion Date: September 2026

Project Description

Spokane School Walk Routes project that will increase pedestrian safety with crossing treatments, sidewalk infill, bumpouts, and ADA curb ramp improvements for children, parents and staff walking to and from school.

Locations

The schools include:

  • Audubon Elementary: Sidewalk infill on Belt Street from Montgomery to Jackson Avenues; striped crosswalks on Belt at Carlisle, Carlisle at Cannon, and Jackson at Cannon, 20 mph school zone signs placed around the school perimeter and ADA wheelchair compliant curb ramps, where needed.
    View Map (PDF 421 KB)
  • Browne Elementary: Striped crosswalks on Greenwood at Olympic, Queen and Olympic near Upper Driscoll, and Driscoll at Queen and Olympic and ADA wheelchair compliant curb ramps, where needed.
    View Map (PDF 353 KB)
  • Garfield Elementary: Striped crosswalk on Buckeye at Normandie, Washinton at Mansfield, Howard at Mansfield, Mansfield at Calispel and Normandie, Knox at Calispel and Normandie, and on Knox at Calispel and Normandie, curb bumpouts at the corners at the striped crosswalk at Mansfield and Washington, 20 mph school zone signs around school perimeter, and ADA wheelchair compliant curb ramps, where necessary.
    View Map (PDF 333 KB)
  • Indian Trail Elementary: Striped crosswalks on Sutherlin at Weile, Weile at Valerie, and Woodside and Drumheller, curb bumpout near the Weile and Sutherlin crosswalk, and 20 mph school zone signs on Sutherlin and Woodside.
    View Map (PDF 352 KB)
  • Logan Elementary and Yasuhara Middle School: Sidewalk infill on Marietta from Hamilton to Nevada and from Columbus to Morton, Morton along Logan Peace Park, curb bumpouts at Nevada at Jackson and Carlisle, striped crosswalks on Carlisle at Nevada and Columbus, Marietta at Morton, and Perry at Jackson, and 20 mph school zone signs around school perimeter.
    View Map (PDF 375 KB)

Contact Information

For questions or concerns regarding the construction work or the construction schedule, please contact the contractor’s public representative.

Contractor Public Representative

Clay Level, 509.954.6626

City Construction Relations Manager
Annie Deasy, 509.625.6102

City Project Manager – Design Phase
Jonathan Adams

City Project Manager – Parametrix
Ben Roberg

Related Links