The Summit Preliminary Long Plat

Application/Permit Number: Z19-228PPLT

Applicant

Whipple Consulting Engineers Inc.

Property Owner

OO Land Holdings, LLC

Location

6820 S Cedar, parcel number: 24121.0001

Description of Project

The applicant is proposing 98 new single family lots on roughly 21 acres located at the intersection of Cedar Road and Eagle Ridge Boulevard. Currently the property is vacant. The project proposes to provide water through a new booster station located at the Cedar Hills tank site, which sits near S Lincoln Way. Sewer will be provided through three phases, the first phase through gravity flow to the existing manhole located at the intersection of Eagle Ridge Blvd & Cedar Rd. The remaining 71 lots in phases two and three are proposed to gravity flow to a private lift station maintained by a Homeowner’s Association to be located near the NW corner of the site.

Decision

A public hearing was held on January 16, 2020 at 9:00AM. The decision was issued on February 7, 2020 by the Hearing Examiner. The date of the last day to appeal is February 21, 2020 at 5:00 PM

Related Documents


Contact Information

Written comments should be sent via mail or email:

Planning and Development Services
Ali Brast
Assistant Planner
808 W. Spokane Falls Blvd.
Spokane, WA 99201-3329
abrast@spokanecity.org