Garbage, curbside recycling, and yard waste pickup will be a day late starting Thursday, with Friday's pickup occurring on Saturday due to the Thanksgiving holiday. Please have your carts out at the point of collection by 6 AM on your collection day. See more information regarding other City closures.

Woodridge View 2nd, 1st Addition Preliminary Short Plat

Application/Permit Number: Z21-048PSP

Applicant

Whipple Consulting Engineers, Inc
21 S Pines Rd.
Spokane Valley, WA 99206

Owner

Whitetail Ridge Spokane, LLC
PO Box 935
Otis Orchards, WA 99027-0935

Location

The proposal is in a portion of parcel 26155.0002, an unaddressed parcel, Section 15 – Township 26N – Range 42. Adjacent to 26151.5105 for reference.

Description of Project

The applicant is proposing to subdivide 1.86 acres of a larger 70.93 acre parcel into six single family lots and one tract. These lots will be situated on either side of Wieber Drive, adjacent to 10712 N Wieber Drive and 10819 N Wieber Drive. This area was previously included in the Woodridge 3rd Addition Preliminary Plat (Z19-145PPLT) which was approved by the Hearing Examiner on Feb 12, 2020. The infrastructure associated with the larger Woodridge 3rd plat is current under construction.

Decision

The Planning Director issued a Letter of Approval with conditions on June 29, 2021. The date of the last day to appeal is the 13th of July, 2021 at 5PM. The appeal fee of $250 must be paid in full at the time an appeal is made. An appeal shall take the form of a written statement of the alleged reason(s) the decision was in error.

Related Documents


Contact Information

Written comments should be sent via mail or email:

Planning & Development Services
Attn: Ali Brast
Assistant Planner
808 W. Spokane Falls Blvd.
Spokane, WA 99201-3329
abrast@spokanecity.org