Cycle 12 Traffic Calming - February 12, 2025 at 3:39 p.m. - Cycle 12 Traffic Calming involves projects citywide, including new sidewalks, bike lanes, curb extensions, traffic medians, and enhanced crosswalks.
Desmet-Superior Sewer Reroute - February 4, 2025 at 12:17 p.m. - This project replaces a damaged 10-inch sewer line near the intersection of Desmet Avenue and Superior Street.
Stevens Elementary Walk Route - January 16, 2025 at 4:38 p.m. - This project focuses on improving pedestrian safety around Stevens Elementary School by adding new crosswalks, sidewalks, and upgraded signals.
Arterial Pedestrian Hybrid Beacons - January 16, 2025 at 4:20 p.m. - This project enhances pedestrian safety by installing four Pedestrian Hybrid Beacons (PHBs) on busy arterials.
Freya Transmission Main - Garland to Wellesley - January 16, 2025 at 4:11 p.m. - This project replaces an aging 30-inch steel water transmission main along Freya Street with a new 30-inch ductile iron main.
Liberty Avenue Preliminary Short Plat - December 19, 2024 at 9:18 a.m. - The applicant/owner is proposing to subdivide vacant parcel addressed at 3712 E. Liberty Ave. into two lots for the purpose of constructing duplexes.
Garland Avenue Preliminary Short Plat - July 16, 2024 at 2:17 p.m. - The applicant is proposing to subdivide parcel 35042.4516 addressed as 1649 E Garland Avenue into 4 lots for residential development.
Illinois Ave Assisted Living Conditional Use Permit - July 15, 2024 at 4:08 p.m. - The 2600 E. Illinois Conditional Use Permit proposes to develop approximately 2.75 acres of land into two residential care facilities.
Cycle 11 Traffic Calming - May 28, 2024 at 1:55 p.m. - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming.
Beacon Hill Complex – John H. Shields Trailhead Improvements - April 12, 2024 at 11:15 a.m. - This trailhead improvement project is a part of the larger City of Spokane Parks and Recreation project known as “Make Beacon Hill Public – Phase 2”
Crown Ave Townhomes Preliminary Short Plat - April 10, 2024 at 12:37 p.m. - Applicant is proposing to subdivide parcel 36324.2737 located at 820 E Crown Avenue into two lots.
2024 Grind and Overlay Street Maintenance - April 5, 2024 at 10:43 a.m. - The City of Spokane Streets Department will be performing routine street maintenance at various locations throughout the 2024 roadwork season.
2024 Street Maintenance Curb Ramps - March 19, 2024 at 10:15 a.m. - Installation of ADA ramps on streets which will receive a grind and overlay by the street department.
2023 Street Maintenance Curb Ramps - March 19, 2024 at 10:04 a.m. - Installation of ADA ramps on streets which will receive a grind and overlay by the street department.
Baldwin and Regal Preliminary Short Plat - November 16, 2023 at 11:12 a.m. - The applicant is proposing to subdivide parcels addressed as 2901 E Baldwin Ave and 2907 E Baldwin Ave into three lots for constructing two duplexes.
Vistas at Beacon Hill Final PUD Plat - November 14, 2023 at 10:54 a.m. - The Application is proposing to finalize the Vistas at Beacon Hill Preliminary PUD/Plat ort Plat for the purpose of building multi-family development.
Lyons Ave Preliminary Short Plat - September 20, 2023 at 2:39 p.m. - The owner is proposing to divide parcels 36283.0406 and 36283.0408 into 13 lots for the purpose of creating vacant lots for new development.
East Wellesley Rebuild – Freya to Havana - August 14, 2023 at 2:57 p.m. - Scope includes an increased number of lanes and reconfiguration, Green Infrastructure and street trees, and replacing water distribution lines.
Cedar Storage Final Binding Site Plan - June 29, 2023 at 3:05 p.m. - The applicant is proposing to final preliminary Binding Site Plan (Z22-250PBSP) granted approval, subject to conditions, on September 20, 2022.
Shiloh Hills Elementary CHAS Conditional Use Permit - June 14, 2023 at 10:17 a.m. - The applicant is proposing to establish a school-based medical and behavioral health clinic at the Shiloh Hills Elementary School.
Gonzaga University Housing Rezone - May 1, 2023 at 4:25 p.m. - The applicant proposes rezoning the property from Context Area 4 to Residential High Density for a 90 bed residence for housing on the GU campus.
Haven Grind & Overlay - February 17, 2023 at 1:57 p.m. - Grind & overlay of Haven St. from Market (near Rockwell) to Market (near Columbia) including pavement repair and ADA ramp replacement.
Division Street Pedestrian Hybrid Beacons - February 9, 2023 at 1:28 p.m. - Install pedestrian hybrid beacons (crossing signals) at three uncontrolled crosswalks on Division.
Cycle 10 Traffic Calming - February 9, 2023 at 12:57 p.m. - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming.
Haven Sidewalk - February 3, 2023 at 2:26 p.m. - Sidewalk west side of Haven St.
Northeast Force Main - February 3, 2023 at 1:41 p.m. - Construct an additional force main (8-inch) between the Northeast Lift Station and the existing stub at Rowan and Myrtle.
Logan Elementary Addition Conditional Use Permit - December 5, 2022 at 4:44 p.m. - The applicant is proposing to construct an approximately 4,965-sq. ft. addition to be used as an Early Learning Center and Community Wellness Center.
Courtland Avenue Preliminary Short Plat - November 4, 2022 at 10:25 a.m. - The applicant is proposing a two-lot short plat using the city's interim zoning ordinance.
Iron Bridge Residences Shoreline Conditional Use Permit - September 12, 2022 at 4:19 p.m. - The applicant is proposing to construct a 4-story multi-family residential building with 162 units including studio and 2-bedroom unit types.
Nevada/Joseph Ped Hybrid Beacon - April 28, 2022 at 11:30 a.m. - Installation of marked crosswalk and pedestrian crossing safety devices, including stop bars, illumination, and audible signals.
Garland Pathway (Cook to Market) - April 28, 2022 at 11:26 a.m. - Installation of shared-use pathway on north side of Garland Avenue from Cook to Market.
2022 Residential Grind and Overlay - April 28, 2022 at 11:22 a.m. - Grind and overlay pavement on Illinois Avenue, from Perry to Market.
Greene/Carlisle Ped Hybrid Beacon and Carlisle Sidewalk - March 1, 2022 at 3:55 p.m. - Project includes pedestrian lighting at crossings, a marked crosswalk, a median refuge island, a pedestrian crossing advance stop bars.
2019 (Cycle 9) School Safety - January 28, 2022 at 2:45 p.m. - Sidewalk and crosswalk improvements. This project is funded with local funds.
Holland Avenue Sewer (Normandie to Colton) - January 25, 2022 at 4:25 p.m. - This project will construct a gravity sewer pipe from North Pointe Lift Station (Colton and Holland) to the intersection of Holland and Normandie.
Thor-Freya Reconstruction (Hartson to Sprague) - January 25, 2022 at 3:53 p.m. - Full roadway reconstruction, curb and stormwater facilities replacement, ADA ramp upgrades, and water/sewer replacements.
Wellesley-Market Intersection Revisions (NSC) - January 19, 2022 at 3:10 p.m. - Improve roadway and intersection capacity in anticipation of future traffic conditions. Upgrade existing utilities.
Family Promise CUP - August 4, 2021 at 3:38 p.m. - The applicant is proposing to convert an existing single-family home into a community service use.
CSO 41 Outfall Pipe Replacement - July 19, 2021 at 3:01 p.m. - Replacement of outfall pipe. This project is funded with local funds.
2021 Residential Grind and Overlay – North - June 30, 2021 at 2:47 p.m. - Residential street repaving. Minor storm sewer system repairs and upgrades may also be completed as part of the paving project.
Illinois Avenue Bikeway Design Options - June 3, 2021 at 4:39 p.m. - This project will identify a preferred design for pedestrian and bicycle improvements on Illinois Ave. based on public input and street context.
Greene Street and Ermina Avenue Signal Changes - December 8, 2020 at 2:44 p.m. - Signal relocation as required for construction of the North/South Corridor.This project is funded entirely by the WSDOT.
Granite Street Shoreline Substantial Development Permit - July 22, 2020 at 9:43 a.m. - The applicant will be reconfiguring the vacated street (a portion of North Granite St.) to include a cul de sac, north of Upriver Drive.
Jayne Auld Preliminary Short Plat - June 8, 2020 at 4:21 p.m. - The applicant is proposing to divide three parcels totaling 79,984 square feet into 6 parcels.
North Foothills Center CC3 Zoning Overlay - June 4, 2020 at 2:27 p.m. - An abbreviated planning process to consider adding a zoning overlay in the North Foothills area.
Nevada and Decatur Comprehensive Plan Amendment - March 20, 2020 at 12:15 p.m. - A proposed amendment to Chapter 3, Map LU-1, Land Use Plan Map and a concurrent amendment to the City of Spokane Official Zoning Map.
Liberty Avenue Comprehensive Plan Amendment - March 20, 2020 at 11:32 a.m. - A proposed amendment to Chapter 3, Map LU-1, Land Use Plan Map and a concurrent amendment to the City of Spokane Official Zoning Map.
Liberty Market Conditional Use Permit - March 5, 2020 at 12:36 p.m. - The applicant is proposing to convert a previous commercial use building into a small neighborhood mini-market/grocery store.
Chick-fil-A Final Binding Site Plan - January 14, 2020 at 10:33 a.m. - The applicant is proposing to final a preliminary Binding Site Plan (Z19-458PBSP) granted approval, subject to conditions, on December 16, 2019.
NSC River Crossings - January 13, 2020 at 9:35 a.m. - This application is for the new NSC bridges crossing the Spokane River located to the east of the existing Greene Street Bridge.
Hoffman Well Station Rehabilitation - December 3, 2019 at 3:40 p.m. - Lining of Well No. 2. Pump Replacement of Well No. 2. Electrical replacement at Wells No. 1 and 2.
Chick-fil-A Preliminary Binding Site Plan - October 15, 2019 at 2:21 p.m. - The applicant is proposing a Binding Site Plan in order to subdivide 3.243 acres of land into 2 parcels for commercial use.
Protecting Leaves and Adding New Trees (PLANT) Ordinance - September 9, 2019 at 4:34 p.m. - Urban Forestry Ordinance with goals to increase the canopy coverage and create new reforestation programs and maintain existing ones.
HA Tombari LLC Comprehensive Plan Amendment - March 26, 2019 at 1:57 p.m. - This proposal is to change one parcel of property currently zoned RMF (Residential Multifamily) to GC-70 (General Commercial).
Jayne Auld Final Short Plat - January 22, 2019 at 12:59 p.m. - The applicant is proposing to divide three parcels totaling 79,984 square feet into 6 parcels for a multi-family complex, duplex homes, and parking.
Violet’s Garden Final Short Plat - January 17, 2019 at 11:32 a.m. - The applicant is proposing to divide an existing parcel with home into two single family lots in order to build one additional single family home.
River Inn Hotel - December 21, 2018 at 3:24 p.m. - This proposal includes overall site improvements and upgrades to the west building exterior including an entry canopy and new siding.
Libertini Preliminary Short Plat - September 26, 2018 at 10:43 a.m. - The applicant is proposing to divide an existing single-family lot in to two lots for the purposes of a new single-family home.
Phillips Final Short Plat - August 13, 2018 at 2:19 p.m. - The applicant is proposing to final a 3-lot short plat (preliminary plat number Z18-347PSP).
SPO Nevada Cell Tower - May 2, 2018 at 11:09 a.m. - 60 foot Wireless Communication Tower w/stealth technology (mono-fir)
Holland Ave Preliminary Short Plat - April 30, 2018 at 3:07 p.m. - The applicant is proposing to divide an existing parcel with an existing office building and warehouse into two lots, to separate the buildings.
Phillips Preliminary Short Plat - April 25, 2018 at 5:03 p.m. - The applicant is proposing to divide an existing parcel into three single family lots.